每天接十几个客人

<dfn id="txdvd"></dfn><font id="txdvd"></font>
<meter id="txdvd"></meter>

    MILESTONES

    2020

    In September,it cooperated with Jilin Electric Power Co., Ltd., a subsidiary of SPIC,focusing on photovoltaic, wind power and other new energy fields, consolidating the main business and achieving win-win development.

    In August, established cooperation with the British fli Group to introduce international leading environmental remediation technology to open up the domestic market.

    2019

    In December,The first PV module of Tunghsu kangtu new line, a subsidiary of Tunghsu Azure, was successfully offline.It marks the successful completion of the second phase expansion project of components.

    In November, the Runzhou garden project of laoju River in Linfen, Shanxi Province was successfully completed and accepted.This is of far-reaching significance to help local urban transformation and ecological civilization construction.

    In August, the third (Xingtai) Garden Expo of Hebei Province opened grandly.This has created the new Xingtai Park City embryonic form, demonstrated the new achievements of Hebei garden development in the new era.

    2018

    In November The directional add-issuance of 2 billion yuan was completed, and the subscription commitments of major shareholders were strictly fulfilled.

    2017

    In December The real estate business was stripped off to seize the historical opportunities of environmental protection and new energy.

    In August It acquired Sichuan Zhiyi Construction and obtained the first-class qualification for municipal public engineering construction general contracting and the first-class qualification for construction engineering general contracting.

    In June It acquired ANX Automation Technology to upgrade the intelligent energy industry.

    In May The acquisition of Xingjing Ecology officially entered the field of ecological environmental protection.

    2016

    In December Tunghsu Azure applied for a Private Placement of 4.85 billion yuan of raised funds for the construction of about 694MW power station

    In June 9.5 billion yuan was raised in the secondary market.

    In March The China Securities Regulatory Commission approved a private placement application for 1.15GW new energy power station investment.


    2015

    In October The main business structure of real estate and new energy two-wheel drive was formed.

    2014

    In December Tunghsu Azure New Energy Investment Co., Ltd was established to formally enter the investment field of new energy power stations.

    2012

    In December The Solar Energy Research Institute was renamed the Solar Energy Business Unit.

    2010

    In January Tunghsu Azure Group established a Solar Energy Research Institute.

    每天接十几个客人,有水吗,一个人的在线观看WWW,专找老年人十元一次,连续接了5个客人